Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Mart Recreational Complex
Mart Recreational and Athletic Complex
McLennan County
Mart Recreational and Athletic Complex
The new 40+ acre Recreational and Athletic Complex is located in Mart, Texas within McLennan County. This project was a combined effort from both the Mart Independent School District and the County of McLennan. This project provided the school district with new athletic fields to be used for High School events as well as community recreational teams. This new complex also provides the local residence with a much needed recreational park. The new improvements included a New Football Field and Track Stadium, a New Baseball Field, a New Softball Field, a New Concession Stand with restrooms, a New 4-acre Fishing Pond, a New 1.5 mile Walking Path, New Playground Equipment, a Gravel RV Park, and New Gravel Parking Lots.

Primary tasks performed include: creating site topographical surveys, providing overall site drainage analysis, site and sports fields grading plan, utility design, fishing pond design and design for the new building, expanded parking lot and new drainage improvements.
Budget:  1.0 Million
Contact:  David Wright
Design Complete 2005
Project Engineer:  Monty Clark, P.E.
*Project designed and completed by Monty Clark, P.E. while owner of a previous company
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC