Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







East Temple Utility Rehab
East Temple Sanitary Sewer and Water Distribution
City of Temple
East Temple Sanitary Sewer and Water Distribution
This project included the design of new utility mains to replace aging infrastructure within North 16th Street and South 16th Street. The projects included the design of approximately 5000 linear feet of 10" water main, as well as new 8" and 12" sanitary sewer mains. The new utilities were located within the existing street and the construction was performed by conventional open trench methods with several roadway bores beneath existing box culvert crossings and major corridor crossings. The project was completed within the original scheduled time constraints and within the projected budget.

Primary Tasks Performed included: Identification of existing right-of-way and property lines, design field surveys, preliminary layout, development of project estimates and budgets, final design, bidding and construction administration assistance.
Budget:  795,000
Contact:  Anthony Daniel
Design Complete 2005
Project Engineer:  Monty Clark, P.E.
*Project designed and completed by Monty Clark, P.E. while owner of a previous company
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC