Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Wilson Park Sewer Improvements
Wilson Park Sanitary Sewer System Improvements
City of Temple
Wilson Park Sanitary Sewer System Improvements
This project consisted of providing a new sanitary sewer system to the City of Temple softball complex at Wilson Park. The project provided approximately 600 linear feet of 8" gravity sanitary sewer main from the existing concession stand and bathroom building to a new sanitary sewer lift station.

The design and construction of the new improvements included measures to provide uninterrupted access to the existing softball fields for local tournaments and games. The new construction had to be coordinated around the City of Temple Parks Department softball schedule.

Primary tasks performed include: providing the conceptual plan, estimating project costs, creating design topography surveys, providing detailed construction plans and specifications, providing bidding and construction administration assistance, on-site inspection services, and meeting the time frames established by the City Parks Department.
Budget:  175,000
Contact:  Salvador Rodriguez, P.E.
Design Complete 2007
Project Engineer:  Monty Clark, P.E.
*Project designed and completed by Monty Clark, P.E. while owner of a previous company
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC