Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







East Adams Sanitary Sewer
Sanitary Sewer Reconstruction
City of Temple
Sanitary Sewer Reconstruction
This project included the design of an emergency 8" PVC SDR 26 Class 160 Pressure Rated Sanitary Sewer Main Reconstruction located adjacent to East Adams Avenue in Temple, Texas. The new sanitary sewer main reconstruction extended approximately 1,900 linear feet between Fowler Avenue to a location east of North 36th Street. This project was designed to reconstruct aging infrastructure that had a history of failing, clogging, and effluent leaking into the adjacent drainage channel. Furthermore, the existing sewer main was located within the pavement of the TxDOT roadway of East Adams. The new sanitary sewer main was relocated to behind the curb of East Adams to help facilitate ease of any future maintenance. The project was completed ahead of schedule and under the project budget.

Primary tasks performed include: Identification of existing right-of-way & property lines; design field surveys; preliminary layout; development of project estimates & budgets; final design; coordination with City Staff and TxDOT; and bidding and construction administration assistance.
Budget:  $290,000
Contact:  Thomas Brown
Design Complete 2008
Project Engineer:  Monty Clark, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC