Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Lift Station Re-construction
2010 Steeplechase Lift Station Re-construction
City of Temple
2010 Steeplechase Lift Station Re-construction
This project consisted of providing a new sanitary sewer lift station replacement within the Steeplechase subdivision located in Temple, TX. The project provided a new 28’ deep 8’ diameter sanitary sewer wet well, new submersible wastewater solids handling pumps, new 4" PVC force main, and a new 8" PVC gravity main replacement to replace an existing aging and highly undersized lift station.

The design and construction of the new improvements included phasing measures to maintain uninterrupted sanitary sewer service flows from the existing lift station until the new lift station could be brought on-line. The new lift station was constructed adjacent to the existing facility within extremely limited space. Once the new system was completed the existing lift station was demolished and removed.

Primary tasks performed include: providing the conceptual plan, estimating project costs, creating design and topography surveys, providing detailed construction plans and specifications, providing bidding and construction administration assistance, performing on-site inspection services, and meeting the time frames and budget established by the City of Temple.
Budget:  $500,000
Contact:  Nicole Torralva, P.E.
Design Complete 2011
Project Engineer:  Monty Clark, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC