Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







2012 Firars Creek Lift Station
2012 Friars Creek Lift Station Improvements
City of Temple
2012 Friars Creek Lift Station Improvements
This project consisted of providing mechanical and electrical improvements to the existing sanitary sewer lift station which serves all of South Temple. This project is located at S. 31st and Highway 93 in Temple, TX. The project provided (3) new 200 HP Drywell pumps, motors, electrical rehabilitation, new VFD’s and control panels, building improvements and lighting protection measures. The design and construction of the new improvements included measures and phasing to provide uninterrupted sanitary sewer flow from the existing liftstation.

Primary tasks performed include: providing the conceptual plan, estimating project costs, providing detailed construction plans and specifications, providing bidding and construction administration assistance, performing daily on-site inspection services, and meeting the time frames and budget eestablished by the City of Temple.
Budget:  $750,000
Contact:  Salvador Rodriguez, P.E.
Design Complete 2012
Project Engineer:  Monty Clark, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC