Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Emergency Sewer - Bird Creek
Emergency Sewer Line Replacement Bird Creek Crossing
City of Temple
Emergency Sewer Line Replacement Bird Creek Crossing
This project included the design of a new aerial sanitary sewer main creek crossing to replace an existing "failing" creek crossing. Because of the condition of the existing sanitary sewer main crossing, this project was completed with an extremely quick design and construction timeline. Due to the highly sensitive location of the utility replacement, this project required a design that would allow for continued sanitary sewer flows within the sewer drainage basin and that would also have a minimal impact on the enviroment as well as the adjoining residential properties.

Primary tasks performed include: Identification of existing property lines and easements, topography surveys, development of project estimates to construct, final sanitary sewer piping designs, structural pier and abutment, bypass pumping designs, landscape and retaining wall designs, bank stabilization and erosion mitigation, bidding services, and daily on-site inspection services.
Budget:  $500,000
Contact:  Thomas Brown & Darryl Briscoe
Design Complete 2009
Project Engineer:  Monty Clark, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC