Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







CDBG Sidewalk Improvements
CDBG South First New Sidewalk Improvements
City of Temple
CDBG South First New Sidewalk Improvements
The City of Temple sidewalk improvements along South First Street were funded through a Community Development Block Grant (CDBG) and are designed to be completed in multiple phases as funds become available. This project includes the rehabilitation of 2,000 linear feet of existing broken and falling sidewalks with decorative brick pavers and concrete edging, handicap ramps, curbs, access drives, and landscaping along South First Street.

Primary tasks performed include: Providing the project conceptual plan, estimating project costs, creating design topography surveys, project coordination with landowners, TxDOT, and city staff, providing detailed construction plans and specifications, providing phasing plans, providing bidding and construction administration assistance, and meeting the time schedule, requirements, and budget associated with the CDBG.
Budget:  $750,000
Contact:  Salvador Rodriguez, P.E.
Design Complete 2011
Project Engineer:  Monty Clark, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC