Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Groesbeck I.S.D.
New Elementary School and Middle School Campus Development
Groesbeck ISD:
New Elementary School and Middle School Campus Development
This new Grosebeck Elementary and Middle School expansion is located in Groesbeck, Texas within Limestone County. This project provided the school district with a new 102,700 square foot elementary and middle school building. this project included the design of 3,100 linear feet of 8" water main, 1,100 linear feet of 8" sanitary sewer, and 4,900 linear feet of storm sewer to include a subfloor drainage system located beneath the new school building. two new access drives and four parking lots with 437 parking spaces were designed to accommodate the parking needs and to provide additional parking for the existing middle school. This project also necessitated the design of two on-site storm water detention ponds and new drainage channels to improve existing campus drainage.

Priamry tasks performed include: Providing overall site drainage analysis, site grading plan, site dimensions plan, utility and storm sewer design, and detention pond analysis for the new building, access drives, parking lots and drainage improvements.
Budget:  $5.0 Million
Contact:  Bill Morgan, AIA
Design Complete 2009
Project Engineer:  Justin Fuller, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC