Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







UMHB Field House
New Addition
UMHB-Anderson FIeld House
New Addition
The new Anderson Field House is located on the university of Mary Hardin Baylor and is being constructed as an addition to the existing field house. This project consisted of a new field house building, to be constructed as a campus addition to the existing field house. In addition, the new development included a decorative courtyard, landscaping amenities, handicap and pedestrian access features, and parking and access drive relocations and adjustments.

Primary tasks performed include: initial site investigation, project coordination, project research, engineering designs, construction document preparation, project coordination and value engineering, and construction administration.

Being Design-Build Construction, the project had a very rapid design and construction timeline.
Budget:  $1.5 Million
Contact:  Tanya Mikeska AIA, Steve Wright
Design Complete 2011
Project Engineer:  Justin Fuller, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC