Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Summer Soccer Complex
Field Expansion and Concession Facility
Summit Soccer Complex
Field Expansion and Concession Facility
The new Summit Soccer Complex is part of an existing sports park located on the north side of Harker Heights and will greatly expand the ability of the city to provide a larger practice and game area for the soccer community. The project consists of a new concession stand/restroom facility, new soccer fields, sanitary sewer and water main extensions, and drainage improvements.

Priamry tasks performed include: Identification of existing rights-of-way, property boundary and easement identification, 100 year flood plain and flood way analysis, field topography surveys, development of project estimates and budgets, project coordination and research, coordination with utility providers, engineering designs, landscape and irrigation designs, architectural designs, structural designs, geotechnical exploration and reports, construction document preparation, bidding services, bid negotiation and award, value engineering, construction administration, and construction inspection.
Budget:  $750,000
Contact:  Jerry Bark
Design Complete 2012
Project Engineer:  Monty Clark, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC