Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Conner Park
Conner Park Site Development
City of Temple
Conner Park Site Development
This new City of Temple Conner Park is located on the west side of town along Old Waco Roadway. The project provides the much needed community recreational area in this rapidly growing portion of Temple. The land was donated to the City specifically for a new community park and the funds were raised through local residential developments. this project provided the local residents with a new sports field, over a quarter of a mile of new concrete walking trach a new playscape, and a new parking lot.Future planning was required to ensure adequate room to grow for a future splash pad, basketball court, and additional parking lot to be added when funds become available.

Primary tasks performed include: providing the conceptual plan, estimating project costs, creating design topography surveys, providing detailed construction plans and specifications, providing bidding and construction administration assistance, and meeting the time frames established by the City Parks Department.
Budget:  $275,000
Contact:  Kim Mettenbrink
Design Complete 2006
Project Engineer:  Monty Clark, P.E.
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899