Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Oak Hills Sewer Extension
Oak Hills Sanitary Sewer Extension
City of Temple
Oak Hills Sanitary Sewer Extension
This project consisted of providing sanitary sewer to the existing Oak Hills residential community that was served by aging septic systems. The project provided gravity sewer connections to approximately 262 residences and was funded by a team effort between the current residents and the City of Temple.

This project included the new installation of sanitary sewers mains ranging from 8" to 12" in diameter. The total project included the installation of approximately 14,500 linear feet of gravity sewer and a new lift station to support 62 residences not able to connect to the new gravity trunk sewer due to elevation conflicts.

The design included measures to provide uninterrupted service to all areas served by this portion of trunk sewer.

Primary Tasks Performed: Identification of existing right-of-way and property lines, design field surveys, preliminary layout, development of project estimates and budgets, final design, bidding and construction administration assistance and construction surveys.
Budget:  1.2 Million
Contact:  Anthony Daniel
Design Complete 2005
Project Engineer:  Monty Clark, P.E.
*Project designed and completed by Monty Clark, P.E. while owner of a previous company
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC