Conner Park
Land Development and Site Planning
The Residences of Canyon Ridge
McLane Site Development
McLane Hangar Site Development
Central Fire Station
Groesbeck I.S.D.
Draughon Miller Fire Station
UMHB Field House
FUMC Temple
Park Planning Services and Recreation Design
Mart Recreational Complex
Conner Park Site Development
Purser Family Park
Goode Connell Park
Summer Soccer Complex
Mart Recreational Complex
Storm Water Management and Design
Industrial Park Detention Pond
Beal St. Drainage Improvements
Transportation Services and Roadway Design
Sparta Road Extension
Commerce Drive Extension
CDBG Sidewalk Improvements
2010 Avenue G Sidewalk
Utility Master Planning and Design
Wilson Park Sewer Improvements
Oak Hills Sewer Extension
2005 Sewer Improvements
East Temple Utility Rehab
2007 Sewer System Improvements
27th Street Water Line
East Adams Sanitary Sewer
General Bruce Dr. and S. 57th
Lift Station Re-construction
2009 General Bruce Drive
2012 Wastewater Replacement
2012 Firars Creek Lift Station
Emergency Sewer - Bird Creek
2010 Wastewater Replacement
27th Street Water Line
Fuller Lane Water Main







Beal St. Drainage Improvements
Beal Street Regional Drainage Improvements
City of Belton
Beal Street Regional Drainage Improvements
This Drainage project for the City of Belton included the regional drainage analysis, design and construction documents for a new regional detention pond and downstream channel improvements. The new regional detention pond was needed to aid in the rapid growth along FM 317 in Belton and would be used to detain storm water from a proposed HEB grocery store as well as the development in the surrounding area. The new downstream channel improvements were critical to this project since the existing channel passed through a residential portion of town and community golf course on its way to the Leon River.

Initial tasks performed include: regional drainage basin analysis including pre & post development drainage calculation, HEC-RAS channel analysis, detention pond sizing, and construction cost estimation.

Tasks performed for construction included: creating detailed design topography surveys, providing detailed construction plans and specifications, providing easement preparation and assisting the City of Belton with acquisition, providing bidding and construction administration assistance, providing construction staking, and meeting the City of Belton’s time frame and budget.
Budget:  775,000
Contact:  Sam Listi
Design Complete 2004
Project Engineer:  Monty Clark, P.E.
*Project designed and completed by Monty Clark, P.E. while owner of a previous company
Clark & Fuller  •  215 North Main Street  •  Temple, Texas 76501  •  254.899.0899
Copyright © Clark & Fuller All Rights Reserved.
Privacy
Site design: Woodward Creative Group, LLC